Map
Gallery
About
FAQ
Contact
Disclaimer
Links
Edit point
In order to edit an existing point, you must type in the original poster's email address.
Original poster's email address:
required
Original poster's Name:
Publicly display my name on site.
(check this & save to edit name)
Photo:
optional (MAX file size 3MB)
Lat:
required
Long:
required
Building Type
- Choose -
Residential
Commercial
Institutional
Hospital, Police, Fire Station
Bridge or Transit Structure
Other, Mixed, or Don't Know
required
Title:
The title can be the building name, an address, or any other short descriptor, such as "Third Street Office Building," "Hayward church," or "My Oakland condo."
required
Description:
Wurster Hall, originally built in 1964, is a four story U shaped building with a 10 story tower on its north side. The original structural scheme was cast-in-place reinforced concrete floors, walls and columns with a pre-cast concrete exterior cladding and sunshades. An in-depth study in 1997 found that the ten-story tower lacked sufficient strength in the east-west direction and its discontinuous shear walls were likely to fail during a seismic event. The U-shaped plan of the building with its reentrant corners also created high lateral stresses in floor slabs. Additionally the interior and exterior gravity columns were in danger of collapse from the expected displacement and building drifts during an earthquake. In order to prevent collapse of the existing pre-cast façade columns, a series of steel columns were added on the interior of the façade to act as secondary gravity supports if the existing columns failed under earthquake stresses. The interior columns were strengthened by carbon fiber wrapping. To brace the north tower and provide additional occupiable space, two tube-like concrete structures were constructed on the east and west sides of the building with new drilled pier foundations underneath. Collector beams were built at each floor to tie the tube structure buttresses together with the existing tower structure to ensure that they would act compositely. The sunshades were also strengthened throughout the building to prevent failure. A unique feature of the retrofit was the use of fly ash (a by-product of coal burning that increases the concrete durability and is environmentally sustainable) in all concrete retrofit elements. This University of California Berkeley building was retrofitted as a part of the SAFER Program (Seismic Action for Facilities Enhancement & Renewal) which systematically reviewed, prioritized, and constructed building retrofits for all UC Berkeley owned and operated buildings. Retrofit Engineer: Forell/Elsesser Engineers Retrofit Architect: Anshen and Allen
This is optional, but we hope you'll share what's significant or interesting to you about this retrofit. What prompted the retrofit project? Was it part of a larger project or program? What was the retrofit objective? Feel free to give engineering or cost details. What's your relationship to the project? You may add your company's name or a link to another site with more project details, as long as your Description is not soliciting business.
optional
Original Structure Type
- Choose -
Wood
Unreinforced Brick
Reinforced Masonry
Concrete
Steel
Other
Don't Know
optional
Retrofit System Type
- Choose -
Wood
Reinforced Masonry
Concrete
Steel
Isolation
Hybrid or Other
Don't Know
optional
Year of Retrofit:
- Year -
Don't know
pre-Loma Prieta
1989, post-Loma Prieta
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
optional
Verification:
Enter in the letters and/or numbers you see in the image.
required
Cancel